
Kathmandu, November 26
A production test has begun at the biogas plant in Teku, Kathmandu.
The plant was test-run on Thursday on the occasion of ‘Kathmandu Climate Action Week 2026’.
Energy, Water Resources and Irrigation Minister Biraj Bhakta Shrestha and Kathmandu Metropolitan City Acting Mayor Sunita Dangol jointly inaugurated the plant.

After the test, the plant has been handed over to the metropolitan city for operation.
The plant has been brought into operation to process organic waste from the Teku Waste Management Centre and to produce biogas and methane from it. It also aims to cut environmental pollution by converting waste into energy and to help build a clean, green and environment-friendly Kathmandu.

The metropolitan city signed an agreement with the Alternative Energy Promotion Centre around the second week of last Shrawan to bring the long-closed plant back into operation.
Construction of the plant began in 2072 BS under the metropolitan city’s Integrated Sustainable Waste Management Project, and it has been in operation since 2075 BS.

When running, the plant was targeted to produce 14 kilowatts of electricity, 300 kg of organic fertiliser and 13,500 litres of water from three metric tonnes of organic waste daily. The metropolitan city and the European Union had invested Rs 18.2 million in it.


