Nepal’s fiscal blind spots are bigger than its debt

fiscal

Nepal’s Finance Ministry knows with near-exact precision what the government owes. Public debt stood at Rs 2.974 trillion at the close of fiscal year 2025/26, equivalent to 45.07 percent of GDP, according to the Public Debt Management Office (PDMO). That was up from 43.79 percent a year earlier. The World Bank and the IMF still classify Nepal as being at low risk of debt distress, with its debt ratio below the 50–55 percent range economists generally consider tolerable for developing countries.

But that apparent comfort begins to fade on closer inspection. The debt stock grew by roughly Rs 300 billion in a year, more than half of which came from exchange-rate losses rather than new borrowing. Debt servicing absorbed Rs 386.22 billion in 2025/26, according to PDMO and budget documents. This year’s allocation of Rs 417.88 billion is almost as large as the Rs 431.1 billion capital budget. By mid-November, public debt had reached Rs 2.975 trillion, or 45.08 percent of GDP, after peaking at Rs 3.009 trillion in mid-October.

The deeper problem lies in what the debt ratio leaves out. It does not capture all the guarantees issued by the state, the off-budget liabilities accumulated by public enterprises or the pension commitments made to retirees. Nor does it account for the assets the government is due to receive. Privately built power plants and telecommunications networks are eventually meant to pass into public ownership, as is the property of dissolved non-profits. Yet these assets remain largely absent from government accounts.

Measuring external debt against export earnings

GDP is an incomplete measure of Nepal’s capacity to service its debt, particularly because more than half of its public debt is owed abroad. PDMO year-end data show that external debt accounted for 53.77 percent of the total. While the Treasury can raise rupees through domestic taxation, foreign loans must be repaid in foreign currency, which the country earns primarily through exports and other external receipts.

Measured against export earnings, the picture looks considerably less comfortable. Nepal Rastra Bank data show that merchandise exports reached Rs 315.29 billion in 2025/26, an increase of 13.8 percent, while imports stood at Rs 2,096.38 billion. Exports therefore covered only about 15 percent of the import bill. External public debt, at 53.77 percent of total debt, amounted to roughly Rs 1.6 trillion, around five times annual merchandise exports.

The World Bank puts Nepal’s total external debt at US$11.87 billion at the end of 2025, a 12.3 percent increase in a year. Concessional borrowing terms ease the immediate repayment burden, but they do not eliminate the underlying exposure. World Bank and PDMO data put external debt at 224 percent of exports of goods, services and primary income, above the thresholds considered safe under an export shock.

Nepal does have substantial external buffers. According to Nepal Rastra Bank, remittances reached US$16.19 billion, the current account recorded a surplus of US$6.33 billion, and foreign exchange reserves covered 19.6 months of merchandise and services imports. But these dollars are earned by migrant workers, not by the Treasury or the country’s exporters. A more revealing test is whether Nepal’s own tradable sector could generate enough foreign currency to meet its external obligations without relying on remittances. It could not do so comfortably.

Currency movements add to the risk. The rupee depreciated from Rs 137.35 to Rs 145.03 against the US dollar in the first seven months of the year. PDMO data attribute Rs 167 billion of the annual increase in public debt to exchange-rate losses.

Two sets of books

Private companies in Nepal are required to account for financial risks and obligations under Nepal Financial Reporting Standards (NFRS). They must recognise provisions when losses become probable under NAS 37, account for the actuarial cost of employee obligations under NAS 19, and recognise concession assets according to their economic substance under IFRIC 12.

The federal government operates under a different system. Nepal Public Sector Accounting Standards (NPSAS) are, in effect, the cash-basis counterpart of the International Public Sector Accounting Standards (IPSAS). Without a transition to accrual accounting, the Treasury generally records an obligation only when cash leaves its accounts. A guarantee that has not been called is not fully reflected as a liability. A pension promised to a civil servant retiring in 2041 is similarly absent from the accounts as a current obligation.

Accrual-based IPSAS and the IMF’s Fiscal Transparency Code call on governments to disclose fiscal risks, including guarantees, contingent liabilities and the finances of public enterprises. The standards also cover assets. IPSAS 32, which governs the grantor’s accounting for service concession arrangements, requires governments to recognise infrastructure they control during a concession, along with the corresponding liability.

Nepal’s accounting system does not adequately capture these obligations and assets before formal handover. The result is an incomplete public balance sheet that understates both the risks the state carries and the wealth it may eventually receive.

Nepal Airlines and workers’ retirement savings

Nepal Airlines Corporation (NAC) borrowed from the Employees Provident Fund (EPF) and the Citizen Investment Trust (CIT) to purchase four aircraft, with the government guaranteeing the loans. The Financial Comptroller General Office records the guaranteed principal at Rs 34 billion. By the end of 2025/26, however, the total liability had risen to Rs 55.92 billion, comprising Rs 44.68 billion in principal and Rs 11.24 billion in accumulated interest.

The Auditor General’s 63rd annual report, released in May, puts NAC’s debt at Rs 31.33 billion to the EPF and Rs 21.12 billion to the CIT, or Rs 52.45 billion combined. This is slightly below the Treasury’s figure. Both institutions hold workers’ retirement savings, leaving their members exposed to the consequences of a default.

Had a finance minister proposed a Rs 55 billion cash bailout for a loss-making airline, Parliament would likely have scrutinised the proposal. Leaving an old guarantee outside the cash ledger can produce a similar outcome without the same public debate, shifting the burden first onto savers and eventually onto taxpayers. The state holds just Rs 3.10 billion in NAC equity, while the airline recorded a loss of Rs 1.04 billion in 2023/24, the largest among public enterprises. The guaranteed liability has grown to more than 18 times the government’s equity stake.

The off-budget liabilities of public enterprises

Nepal operates 45 public enterprises. According to the Finance Ministry’s annual review, 27 made a profit in 2024/25, 16 recorded losses and two were closed. Together, these enterprises hold assets worth Rs 3.2 trillion, against roughly Rs 800 billion in government shares and loans. Yet Treasury dividends amounted to just Rs 8.83 billion in 2023/24, equivalent to about 2.4 percent of the state’s share investment. The losses accumulated by the sixteen underperforming enterprises create an implicit expectation that the government will eventually step in to support them.

Nepal Oil Corporation offers another example of how policy decisions can create liabilities outside the budget. In October 2026, the corporation held retail fuel prices steady through the festival season and projected a net loss of around Rs 7.5 billion for the first quarter. Its price stabilisation fund held Rs 4.7 billion, enough to cover only a month or two. A consumer subsidy absorbed by the corporation rather than recorded directly in the budget can ultimately shift costs onto suppliers, banks and the Treasury.

The Nepal Electricity Authority’s reported profits also need to be considered alongside its outstanding receivables. The Auditor General’s 63rd report and Energy Ministry disclosures put uncollected tariff arrears at Rs 50.01 billion. These include Rs 26.95 billion in disputed dedicated-feeder and trunk-line bills owed by 61 industries, for which an inquiry commission recommended collecting around Rs 6 billion. Another Rs 9.93 billion is owed by local governments for street lighting, with Kathmandu Metropolitan City accounting for Rs 1.986 billion in principal. The remaining arrears include overdue payments from government offices, security agencies and commercial users. There is no clear public record of how much of this amount has been recognised as potentially unrecoverable.

Pension obligations are another major liability missing from the government’s full fiscal picture. Pensions for civil servants, police personnel, army personnel and teachers cost about Rs 81 billion in 2024/25, roughly 5 percent of the federal budget, according to the Pension Management Office. The 10 percent increase in civil-service starting salaries this year will raise future pension commitments further. Yet the state does not conduct an actuarial valuation of its overall retiree obligations, recognising the expense largely when payments are made.

The Auditor General has also repeatedly raised concerns about public funds held by autonomous boards and development committees outside the Consolidated Fund. Its 63rd report recorded unsettled audit arrears of Rs 755.17 billion at the end of 2024/25, across Rs 9.48 trillion in audited accounts covering 5,526 offices. The net figure rose by 2.99 percent, even after clearances offset Rs 88 billion in new irregularities. Finance Minister Swarnim Wagle’s budget speech has proposed dissolving 31 such bodies and restructuring another 18.

The other side of the ledger

The government’s incomplete accounts do not only conceal liabilities. They also fail to recognise assets that are expected to become public property.

Build-own-operate-transfer (BOOT) contracts and telecommunications licences follow a similar arrangement. A private company finances and builds infrastructure, operates it for a fixed period to recover its investment and earn a return, and eventually transfers the asset to the state. Under IPSAS 32, a government that controls such infrastructure should recognise the asset during the concession period, alongside the corresponding liability. Nepal, however, generally records and values these assets only when the transfer takes place, if it does so at all.

Telecommunications and the Smart Telecom lesson

Section 33 of the Telecommunications Act 2053 (1997) provides that the assets of an operator with more than 50 percent foreign investment pass to the Government of Nepal when its licence expires. Smart Telecom illustrates the risks of leaving such transfers unplanned and unaccounted for.

The Nepal Telecommunications Authority revoked Smart Telecom’s licence in April 2023, leaving around Rs 30 billion in unpaid dues. Although the infrastructure was supposed to come under state control, the government had no effective inventory or custody arrangements in place. In September 2025, Nepal Investment Mega Bank, a lender to the company, auctioned assets Smart Telecom had pledged against a Rs 5.2 billion credit facility. The sale recovered around Rs 4.6 billion for the bank, while the Treasury received nothing against the roughly Rs 30 billion owed to it.

In August 2026, prosecutors filed a Rs 96.12 billion damages case at the Kathmandu District Court against 22 individuals, Smart Telecom, Ncell and the bank. The allegations remain before the courts. The case also reflects an unresolved legal dispute. A 2022 regulation provides that the assets of operators whose licences have lapsed come under the regulator, while lawyers have argued that a regulation cannot override the parent Act. By the time the dispute reached court, the assets had already been auctioned.

Ncell’s licence presents a more immediate test. Issued on 1 September 2004 for 25 years, it expires at the end of August 2029. The government’s 2024 renewal was granted on the understanding that the company’s assets would pass to the state when the term ends. Yet no verified valuation of the network is available because the government has never conducted a comprehensive inventory. Moreover, not all equipment will retain its current value. Switching systems and older hardware depreciate quickly and may require replacement.

The regulator has begun addressing the risk. In September 2026, it barred Ncell from raising loans against or selling its assets and instructed the company to prepare a handover plan. The government now needs an audited asset register, an independent valuation and a clearly designated public authority responsible for the transfer and subsequent management.

Hydropower plants approaching handover

Hydropower presents an even larger potential transfer of public assets. Under Nepali law, hydropower projects generally become state assets at the end of their licence periods, typically after about 30 years of operation. Privately financed BOOT projects follow this model. Nearly 100 hydropower companies are already listed on the stock exchange, and some of the earliest projects are approaching the end of their operating terms.

The experience with Khimti I offers an early warning. The 60 MW project, built by Himal Power and operating since mid-2000, was structured differently from a straightforward handover. Its agreement provides for the Nepal Electricity Authority to acquire a 50 percent stake, with a new joint company operating the plant for the remaining licence period. The arrangement was designed around a 50-year licence, with 30 years of operation under the original structure. The transfer is now more than five years overdue. In June 2026, the energy minister reconstituted the negotiating committee to pursue it.

Upper Bhote Koshi, a 45 MW project, is another test. Its owner was reported in late 2025 to be about three years away from handing over the plant. In autumn 2025, local groups shut down the project for a month to demand 10 percent free shares, and the company agreed. Experts have pointed out that there is no clear legal provision governing what happens to those locally held shares after the government takes ownership. A transfer that is only a few years away therefore carries an ownership claim that has yet to be properly accounted for.

There is also a risk that the state will inherit infrastructure in poor condition. As a concession approaches its end, an operator may have little incentive to replace ageing turbines or undertake major repairs to civil works. Without independent inspections and audits of end-of-term maintenance, the government could take over plants requiring substantial capital investment rather than receiving the windfall the transfer is supposed to represent.

The uncounted property of NGOs and INGOs

Registered non-profits are governed by the Associations Registration Act 2034. Those receiving foreign funding or signing project agreements are also subject to the Social Welfare Act 2049 and the oversight of the Social Welfare Council. Under existing rules, the property of a registered non-profit passes to the Government of Nepal upon dissolution. The Auditor General has recommended forming a team to identify these assets and bring them under government control.

Even the number of organisations operating in the sector is unclear. In August 2026, the Council’s member-secretary told a parliamentary committee that around 60,000 NGOs were affiliated with it, but only about 10,000 were active. Yet the Council’s database listed 57,978 as active in March 2026, while an independent study estimated 25,760 at the end of 2024/25. Of approximately 250 INGOs on record, only 136 are reported to be active.

The scale of the sector makes the absence of an asset inventory more significant. A government study estimates annual spending of up to Rs 71 billion and projects worth around Rs 3 trillion over nine years. Despite this, no public valuation of the property that could eventually pass to the state has emerged.

Opening the books

Addressing these gaps does not require a complete overhaul of public financial management overnight. It requires a more comprehensive ledger, clear institutional responsibility and a gradual move towards recognising the government’s full financial position.

The Ministry of Finance should publish a comprehensive statement of fiscal risks alongside every annual budget. This should include outstanding guarantees, public enterprise payables, disputed receivables and an actuarial estimate of pension obligations. The IMF’s fiscal transparency standards already call for such disclosures.

Parliament should also establish a legal ceiling on sovereign guarantees and require the PDMO to monitor compliance. When a guaranteed borrower defaults, the government should immediately recognise the resulting exposure in the budget rather than waiting for the liability to become a cash payment. Had such a system been in place, the Nepal Airlines loans would have faced greater scrutiny much earlier.

The Financial Comptroller General Office should begin moving federal accounts towards accrual-based reporting in stages, starting with the items that most distort the government’s financial position: sovereign guarantees, employee pensions and service concession assets. IPSAS 32 provides a framework for recognising infrastructure controlled by the state during concession periods, rather than waiting until formal handover.

Finally, the Ministry of Finance should work with sector regulators, including the Nepal Telecommunications Authority, the Department of Electricity Development and the Social Welfare Council, to establish a central register of assets due to revert to public ownership. Each BOOT plant, telecommunications network and non-profit estate approaching transfer should undergo an independent valuation and condition assessment, with a designated public custodian. A handover team should be appointed at least five years before the transfer date. The Office of the Auditor General should also be mandated to inspect and audit end-of-term maintenance while operators can still be held accountable. For Ncell, the deadline is approaching. For Khimti, it has already passed.

The 45 percent debt figure will continue to appear in budget speeches. It is accurate as far as it goes. But every finance minister should be asked what it leaves out, and what the state is worth once its obligations and the assets it stands to inherit are counted.