
Kathmandu, September 7
The Narayangadh-Muglin road section will face partial closures from this morning as authorities carry out landslide prevention work at Tuin Khola.
According to a notice issued by the Chitwan District Administration, soil-cutting work will be carried out under the Tuiin Khola project while repair work is underway at Krishnabhir in Dhading.
The notice said the authorities will use the period during which traffic remains affected by the Krishnabhir road repairs to carry out the work at Tuiin Khola.
The work will continue until the road repairs at Krishnabhir are completed and traffic resumes normally.
Authorities will periodically stop traffic to clear loose soil and debris from the upper section above Tuiin Khola, where landslides have been occurring frequently.
The Narayangadh-Muglin road will be open for traffic during the following periods:
- 8:00am to 8:30am
- 10:30am to 11:00am
- 1:00pm to 1:30pm
- 3:50pm to 4:00pm
- After 6:00pm
Traffic will be stopped at the site outside these designated periods to allow the work to proceed, according to the administration.