+

Rs 50 million sought for reconstruction of Dodhara Chandani suspension bridge

Mahendranagar, November 24

A budget of Rs 50 million has been sought to reconstruct the Dodhara Chandani suspension bridge over the Mahakali River, which was damaged by floods on September 30.

Pedestrian movement across the bridge has been completely disrupted after one of its pillars was damaged.

Shankar Budhathoki, planning chief of the Suspension Bridge Division, said that the first phase requested Rs 50 million from the Ministry of Infrastructure Development to reconstruct the historic bridge connecting Bhimdatta Municipality and Dodhara Chandani.

“A detailed cost estimate is yet to be prepared, as soil testing is required. However, the water current around the damaged section has prevented technicians from conducting the tests,” Budhathoki said.

He added that other technical assessments would be carried out and the contract process initiated once the water level in the river recedes.

A two-member technical team led by Kamal Kumar Adhikari, deputy director general of the Suspension Bridge Division, visited Kanchanpur to assess the damage. The team estimated that the bridge had sustained damage worth Rs 70 million and that Rs 200 million would be required for its reconstruction and restoration of services.

In addition to the damaged pillar, two other pillars were also found to be in a fragile condition and require repairs, according to the inspection team.

Meanwhile, the Sudurpaschim Province government has allocated Rs 10 million for the reconstruction of the Dodhara Chandani suspension bridge.

The bridge is also a well-known tourist destination in the country.

React to this post

RSS is a government-run national news portal of Nepal.

More From the Author

Conversation

New Old Popular

Related News